左云高家窑煤业有限公司位于左云县水窑乡境内,根据矿区平面布置及矿区初步设计资料,矿井地面35/10kV变电所,位于选煤厂电气楼南偏西,直线距离约180m,矿井地面35/10kV变电所,设35kV、10kV、0.4kV高低压配电室,电压等级为35kV、10kV、380V,主要采用10kV供电,均为单母线分段接线方式,两回35kV电源一回路工作,另一回路做备用。以鹊山高家窑煤业有限责任公司矿井选煤厂为例,对选煤厂供配电、控制及自动化做可行性研究报告设计。
Zuoyun Gaojiayao Coal Industry Co., Ltd. is located in Shuiyao Township, Zuoyun County. According to the layout of the mining area and the preliminary design information of the mine, the ground of the mine is 35 / 10kV substation located in the electrical building south of the coal preparation plant, 35m, 10kV, 0.4kV high and low voltage distribution room with voltage level of 35kV, 10kV and 380V, mainly using 10kV power supply, all of them are single busbar sectional wiring mode, with two 35kV Power a loop work, the other loop backup. Taking the Coal Preparation Plant of Queshan Gaogaoyao Coal Industry Co., Ltd. As an example, the Feasibility Study Report Design of Coal Preparation Plant for Power Distribution, Control and Automation is made.