工程造价是一项工程的预期或实际开支的所有固定资产投入金额。因其项目建设用时长、投资大、所设部门多,因此在计算价格时需多次性,计算方法多样及依据复杂的特点。整个投资管理过程还没有具体的管理理念。各投资管理层的不完善导致投资损失浪费普遍。本文对现阶段工程造价控制全过程出现的问题和原因做出以下阐述。并针对原因做出有效控制。
The project cost is the amount of all fixed assets invested in the expected or actual expenditure of a project. Because of its project construction with long duration, large investment, set up departments and more, so in the calculation of the price to be multiple, calculation method is diverse and based on complex characteristics. The entire investment management process has no specific management philosophy. Imperfect investment management leads to widespread loss of investment. This article makes the following explanations on the problems and causes that occur in the entire process of project cost control at the present stage. And to make effective control of the reasons.