【摘 要】
:
苏联罗贡斯克坝位于苏联中亚的瓦赫什河上,罗列克土坝的上游,最大坝高325米,是目前世界上在建的最高土坝。1979年4月进入施工准备阶段。土坝采用壤土心墙,心墙两侧将设反滤
论文部分内容阅读
苏联罗贡斯克坝位于苏联中亚的瓦赫什河上,罗列克土坝的上游,最大坝高325米,是目前世界上在建的最高土坝。1979年4月进入施工准备阶段。土坝采用壤土心墙,心墙两侧将设反滤过渡层及砾石支撑棱体,坝表面将采用块石压重层。心墙基础将用喷混凝土及固结灌浆加固。基础下将设两排帷幕灌浆。坝顶长650米,坝底宽1,500米,坝体方量6,200万立方米。
The Soviet Rogansk Dam is located on the Vakhsh River in Central Asia of the Soviet Union. The upper reaches of the Lerik Dams are 325 meters high, making it the tallest earth dam currently under construction in the world. April 1979 entered the construction preparation stage. The earth dam is made of loam core wall, and both sides of the core wall will be provided with filtration transition layer and gravel supporting prism body. Core wall foundation will be sprayed concrete and consolidation grouting reinforcement. Basis will be set up two rows of curtain grouting. The crest is 650 meters long, with a dam width of 1,500 meters and a dam volume of 62 million cubic meters.
其他文献
New Observations on Phosphatized Spheroidal Fossils in Sinian Doushantuoan Phosphorites in Weng’an, Guizhou Province YIN Chongyu, GAO Linzhi, XING Yusheng Ins
奥地利正在施工的芬斯塔特堆石坝(Finstertal rockfill dam)是目前世界上最高的沥青混凝土心墙堆石坝,心墙最大高度,在控制廊道以上96米。由于坝基岩面顺河床成脊背状,心墙
近年来,由于水利、水电、水运、船模等科学研究的急需,我们研制成功了热线流速仪(图1)。 热线流速仪是用电阻温度系数很高的铂、钨、铂铑合金等材料拉制成非常细(5~10μm)而
一小清河是山东省省会一济南市的入海水道,河口拦门浅滩是其航行障碍。在研究小清河口外航道整治措施时,必须分析黄河入海泥沙对小清河的影响,因为现在黄河河口距小清河口仅
在自然界中,尽管三角洲是千变万化,但仍可以通过综合分析,从演变模式的角度,归纳出几种基本类型。这种研究,不但有其理论上的价值,同时对综合开发与整治三角洲亦有其现实意
在本文中主要讨论了下述三个问题:(1)梯级正常高水位之确定;(2)根据电力系 统开支为最小原则确定梯级电站最有利之水库工作深度;(3)梯级电站枯水年之蓄水次序。 在论证梯级最有利之正常高
在研究水库群联合防洪运用时,为了阐明各个工程削减洪峰和洪量的确切作用,或为了给出水库群调洪后下游控制断面的设计洪水洪峰、洪量及过程线,首先要求控制断面设计洪水过程
风靡世界的山地自行车──荣获厦门市1992年度科技进步三等奖厦门自行车厂谢贤武山地自行车,英语叫MoutainBike,缩写为。国内亦有译为登山车或爬山车,均属同一车型。山地自行车是八十年代中期诞
The use of Pr3+co-doping for great enhancement of mid-infrared(mid-IR) emissions at 2.9 μm and 2.4 μm is investigated in the Ho3+/Pr3+co-doped LiYF4 crystals.
节油工作应从控制好节气门,掌握行驶路线、合理保养车辆和保管好油料四个环节入手,才能使其收到良好的社会效益和安全效益。 控制好油门。驾驶员要严格控制节气门,发动车辆