论文部分内容阅读
预应力管桩,作为一种新型的有别于传统的地基桩,目前已经随着自身的优势在建筑地基处理施工当中得到了广泛的运用,无论是在工业建筑施工,还是在民用建筑施工当中,都能看到它的身影。当然,就目前的预应力管桩技术而言,由于其自身就是一种有别于传统桩基技术的措施方法,在进行实际的施工过程中,应加强对其特殊技术工艺相关方面的了解。因此,鉴于目前相关施工单位或部门对预应力管桩施工技术把握的还不是很好,将紧紧围绕着地基处理中预应力管桩的运用这一中心主题,从预应力管桩的特点出发,分析介绍其施工技术原理及工艺。
As a new type of pile which is different from the traditional foundation pile, prestressed pipe pile has been widely used along with its own advantages in the construction of foundation treatment, both in industrial construction and civil construction , Can see its shadow. Of course, with the current prestressed pipe pile technology, since it is a measure that is different from the traditional pile foundation technology, it is necessary to strengthen the understanding of relevant aspects of its special technical process during the actual construction. Therefore, given that the relevant construction units or departments have not mastered the construction technology of prestressed pipe piles very well, we will closely focus on the central theme of the application of prestressed pipe piles in foundation treatment and proceed from the characteristics of prestressed pipe piles , Analysis and introduction of its construction technology and technology.