Based on the analysis about the hydrogeological conditions and engineering geological conditions, this paper makes analysis on the possible risks of the deep ov
The first floating platform concept design work for South China Sea is undergoing in DMAR’s office now. This tension leg platform has potential to become the f
The present research deals with the numerical prediction of the air gap within the 6th generation of deepwater drilling floating semi-submersible platform and t