论文部分内容阅读
近日,淮河防总秘书长、淮委党组成员、巡视员汪斌对淮河干流蚌埠至浮山段行洪区调整及建设工程防汛准备工作进行了检查,淮委副巡视员、防办主任徐英三陪同检查。汪斌一行先后来到临北段长淮泵站、花园湖行洪区进洪闸等建设现场,实地查看在建工程建设情况,了解存在的困难,并听取了建设局负责同志对工程施工计划安排、防汛度汛方案制定等情况的汇报。
Recently, Wang Bin, member of the General Secretary of the Huai River Prevention and a member of the Party Committee of the Huai River Committee, and inspector Wang Bin conducted inspections on the adjustment of flood and discharge areas in Bhubu to Fushan in the mainstream of the Huaihe River and flood control preparations for construction projects. Xu Ying-san, deputy inspector and director of the Huai River Committee, accompanied the inspection. Wang Bin and his entourage came to the construction site of Changhuai pumping station in Linbei section and flood gate in Garden Lake flood zone to inspect the construction progress of the project under construction and understand the existing difficulties and listened to the comrades responsible for construction of the project Arrangements, flood control flood plan development and other reports.