论文部分内容阅读
解决珠江防洪问题,必须以一个全面规划、综合利用的流域规划为基础。流域规划的任务是用最少的人力、物力、财力,对整个流域、必要时还要配合相邻流域的水利资源、综合利用,进行全面规划。其目的是为人民除害兴利,发挥国民经济的最大效益,创造最大的财富,为四化建设奠定良好的基础,造福子孙万代。从整个珠江流域规划任务的安排来说,必须除害兴利相结合,治标治本相结合。根据整个珠江流域近期的需要和配合
To solve the problem of flood control in the Pearl River must be based on a fully planned and comprehensively utilized basin plan. The task of river basin planning is to carry out overall planning with minimum manpower, material resources and financial resources for the entire river basin and, if necessary, the water resources of the adjacent river basins and their comprehensive utilization. Its purpose is to create benefits for the people, maximize the benefits of the national economy, create the greatest wealth and lay a sound foundation for the four modernizations for the benefit of generations to come. From the planning of the entire Pearl River Basin, we must combine the elimination of harmful and harmful elements and the combination of the two. According to the recent Pearl River Basin needs and cooperation