论文部分内容阅读
Sinopec Group started building its first liquefied natural gas (LNG) project in Jiaonan,Qingdao,Shandong province on September 10th.The LNG project,based at Dongjiakou in Jiaonan city,comprises a receiving terminal,dock facilities and pipelines.It will be completed in two phases.The first phase,which will be able to handle 3 million t/a of LNG,includes three LNG storage tankswith a capacity of 160 000 m~3 each,one berth able to dock LNG carriers with shippingcapacity ranging from 80 000 to 270 000 m~3 and receiving facilities,as well as400 kilometers of gas pipelines with a designed capacity of 4 billion m~3/a linkingDongjiakou with Boli,Jiaozhou and Laixi and linking Rizhao and Linyi.The con-
Sinopec Group started building its first liquefied natural gas (LNG) project in Jiaonan, Qingdao, Shandong province on September 10th. The LNG project, based at Dongjiakou in Jiaonan city, includes a receiving terminal, dock facilities and pipelines. It will be completed in two phases. the first phase, which will be able to handle 3 million t / a of LNG, includes three LNG storage tanks with a capacity of 160 000 m ~ 3 each, one berth able to dock LNG carriers with shipping capacity interval ranging from 80 000 to 270 000 m ~ 3 and receiving facilities, as well as 400 kilometers of gas pipelinelines with a designed capacity of 4 billion m ~ 3 / a linking Dongjiakou with Boli, Jiaozhou and Laixi and linking Rizhao and Linyi.The con-