宁波象山港公路大桥的主桥钢箱梁采用BL250型桥面吊机进行吊装施工。介绍BL250型桥面吊机的主要技术参数、主要结构及工作原理。工作时,该型桥面吊机锚固站位于已安装斜拉索的钢箱梁上,利用驳船将钢箱梁节段运输至桥位,下放吊具至船上并与钢箱梁连接,之后起吊钢箱梁到桥面,利用吊机在竖向、横向和纵向3个方向的调整功能以及吊具的坡度调整功能实现钢箱梁的精确对位,并与已安装的钢箱梁进行对位焊接,焊接完成后,将桥面吊机前移到下一架设工位,待斜拉索挂设好后,进行下一节段的架设,直至桥梁合龙。整机前移采用液压缸走行系统,具有移动平稳,走行快,所需操作人员少等特点。
Ningbo Xiangshan Port Bridge main bridge steel box girder using BL250 type bridge crane lifting construction. The main technical parameters, main structure and working principle of BL250 deck crane are introduced. Work, the type of bridge crane anchor station is located on the cable stayed steel box girder, the use of barges steel girder section transport to the bridge position, the spreader to the ship and connected with the steel box girder, and then lifting Steel box girder to the bridge deck, the use of crane in the vertical, horizontal and vertical adjustment of the three directions and spreader sling adjustment function to achieve accurate positioning of the steel box girder, and has been installed steel box girder alignment Welding, welding is completed, the crane deck move forward to the next erection site, pending the stay cable set up, the next section of the erection, until the bridge closure. The machine moves forward using hydraulic cylinder system, with a smooth movement, fast travel, fewer operators and other characteristics required.