论文部分内容阅读
沈西工业走廊铁路是铁道部和辽宁省共同投资建设的铁路,一期工程自沈阳枢纽沈山线三台站至沈阳西部工业走廊火石岗站,主要满足沈阳西部工业区对铁路的运输需求。本文根据辽宁沿海经济带战略发展规划,结合沈西工业走廊铁路一期工程,深入研究沈西工业走廊铁路二期工程的线路走向方案,使沈西工业走廊铁路成为走廊的龙头和出海口,打通联结沈阳老工业基地与港口的运输通道。
The Shenyang-West Corridor Railway is a railway jointly invested by the Ministry of Railways and Liaoning Province. The first phase of the project is from the Sansen Station on the Shenyang Line at Shen Shan Line to Huo Shigang Station at the Industrial Corridor in the western part of Shenyang City. The main project is to meet the railway transport needs of the industrial zone in western Shenyang. Based on the strategic development plan of Liaoning coastal economic zone and the first phase of the Shenyang-Shenyang Industrial Corridor Railway, this paper conducts an in-depth study of the line direction plan of the second phase of the Shenyang-West Industrial Corridor Railway to make the Shenyang-Shenyang Industrial Corridor Railway the leading and opening corridor, Link Shenyang old industrial base and the port of the transport corridor.