我校科技人员以科研为三峡工程服务.目前完均成32项成果,有一批达到国际国内先进水平,为三峡前期工程解决了不少重大课题.水电教研室提出一套新的理论模式和计算方法,从理论上论证了:借助葛洲坝的反调节作用,完全可能实现对非稳定流的控制,保证中下游航运的正常进行,为整个三峡工程的可行性论证又注上了有力的一笔.该教研室对多水库群的优化运行控制的研究曾获1990年国家科技进步三等奖,这项成果,也将运用到三峡工程中,实现对三峡葛洲坝枢纽的梯级调度,这将使三峡库群系统的发电效益大大提高.
Our science and technology personnel to research for the Three Gorges Project services.At present, there are 32 achievements, a group reached the international and domestic advanced level, for the Three Gorges Project to solve many major issues. Hydropower Department proposed a new theoretical model and calculation method It is theoretically proved that with the help of the anti-regulation effect of the Gezhouba Dam, it is entirely possible to control the unsteady flow and ensure the normal operation of the mid-down-stream navigation, putting a strong note on the feasibility of the entire Three Gorges Project. The research team optimized the operational control of multiple reservoirs won the third prize of National Science and Technology Progress in 1990. This achievement will also be applied to the Three Gorges Project to realize the cascade dispatching to the Three Gorges Gezhouba Dam. This will enable the Three Gorges Reservoir Group System The power generation benefits greatly increased.