在研究性重水反应堆改建中,为提高热工分析的准确度,以保证反应堆安全运行,在工程启动和试运行中,进行了反应堆压力室流量分配测量、惯性流量测量和元件表面温度测量。
In order to improve the accuracy of the thermal analysis and to ensure the safe operation of the reactor during the reconstruction of the research heavy water reactor, the flow distribution measurement, inertial flow measurement and element surface temperature measurement of the reactor pressure chamber were carried out during the project start-up and commissioning.