滏阳钢铁厂第四车间有6.5立方公尺高炉6座,工人600余人,车间干部21人。由于建炉时间不长,干部缺乏管理经验,现场十分紊乱,高炉生铁产量低,质量差,焦比大,成本高。原料、工具、劳动保护用品方面也存在很多浪费。为解决上述问题,我们在厂党委的具体领导下开展了增产节约运动,大闹群众性的技术革命。增产节约运动,我们从反浪费入手,边
The fourth workshop of Shenyang Steel Plant has 6 cubic meters of blast furnaces with more than 600 workers and 21 workshop cadres. As the construction of a long time, cadres lack of management experience, the scene is very chaotic, blast furnace pig iron production is low, poor quality, large coke ratio, high cost. There is also a lot of waste in raw materials, tools and labor protection products. In order to solve the above problems, we conducted a technical revolution to increase production and conserve energy and mass the mass under the specific leadership of the factory party committees. Increase production and save sports, we start from the anti-waste, while