冶金部科技司于1991年12月12~14日在绍兴主持召开了高炉炉前工作会议。会议交流了经验并讨论了今后的任务。会议强调了炉前工作对实现高炉“高产、优质、低耗、长寿”的重要性,建议各级领导对炉前工作给予足够的重视,积极采取措施改变落后面貌,具体建议有:①根据炉容和顶压大小采用不同挡次炮泥,大高炉应采用配加刚玉、
Department of Science and Technology Ministry of Metallurgical December 12, 1991 to December 14 in Shaoxing presided over the convening of blast furnace work conference. The meeting exchanged experiences and discussed future tasks. The meeting stressed the importance of blast furnace work to achieve “high yield, high quality, low consumption and long life” of the blast furnace. It is suggested that leaders at all levels should pay sufficient attention to the work in front of the blast furnace and take active measures to change the backwardness. Specific suggestions are as follows: The capacity and the size of the top pressure using a different block shots, large blast furnace should be used with corundum,