Risk management in open cut coal mines

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:shushuclover1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
There are a number of geotechnical systems used at open cut operations of Anglo American’s Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological information and used as hazard plans. They are qualitative and reliant upon the experienced judgement of site based engineers and the general workforce. They are not suitable for calculating the associated risks of geological structures and mining responses. A uniform risk rating system that can be used to provide an unbiased, standard and quantifiable assessment of the risk from highwall and lowwall failures is therefore developed using the experience gained with such systems in Anglo American’s South African operations. This system is a semi-quantitative risk rating system and takes into account the relative differences in the importance of hazards as experienced at each mine site as a result of different combinations of geotechnical factors and mining conditions. It is based on critical geotechnical and other parameters that have been identified by site mining engineers, geologists and geotechnical engineers. The primary advantage of this risk rating system is that all open cut mines in the Anglo American’s Metallurgical Coal operations use a near identical system, which enables the user to compare the risk after each blast and with other mines. The system can be adjusted to meet local mine specific requirements. The implementation of this system, a computer program that automatically calculates the risks and recommends predetermined controls, has been made as practical and as easy to use as possible. This program can be used by personnel from other mining disciplines not directly related to geotechnical engineering. There are a number of geotechnical systems used at open cut operations of Anglo American’s Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological information and used as hazard plans. They are qualitative and reliant upon the experienced judgement of site based engineers and the general workforce. They are not suitable for calculating the associated risks of geological structures and mining responses. A uniform risk rating system that can be used to provide an unbiased, standard and quantifiable assessment of the risk from highwall and lowwall failures is thus therefore developed using the experience gained with such systems in Anglo American’s South African operations. This system is a semi-quantitative risk rating system and takes into account the relative differences in the importance of hazards as experienced at each mine site as a result of different combinations of geotechnical factors and mining conditions. It is based on criti cal geotechnical and other parameters that have been identified by site mining engineers, geologists and geotechnical engineers. The primary advantage of this risk rating system is that all open cut mines in the Anglo American’s Metallurgical Coal operations use a near identical system, which enables the user to compare the risk after each blast and with other mines. The implementation of this system, a computer program that automatically calculates the risks and participants recommend offers, has been made as practical and as easy to use as possible. This program can be used by personnel from other mining disciplines not directly related to geotechnical engineering.
其他文献
[本刊讯]7月25日,享誉国内外的英皇集团一行7人莅临深圳市中建南方装饰工程有限公司总部大楼及公司在深圳交付使用的欢乐海岸中影影视厅、深圳免税大楼等项目现场,进行为期一天
Based on water inrush accident of 1841 working face of Desheng Coal Mine in Wu’an, Hebei province, China, an evaluation model of hydrodynamic characteristics o
期刊
又近中秋.据报载,国家有关部门最近联合发布了关于规范月饼价格、质量、包装以及搭售等行为的公告,月饼包装的国家标准也即将出台.这对于规范月饼市场行为,制止天价月饼等不
目的 研究PR间期延长与糖尿病视网膜病变(DR)的相关性,为临床早期发现DR提供参考依据.方法 选取2014年5月至2016年3月于西京医院内分泌科住院的2型糖尿病(T2DM)患者797例为研
目的探讨女性乳腺癌患者术后并发症情况对抑郁的影响。方法 2015年6月—2016年5月选取唐山市人民医院住院的女性乳腺癌手术治疗的患者337例,采用汉密顿抑郁量表(HAMD)对患者
期刊
本文主要对液-液聚结分离原理进行了阐述,在此基础上,并对聚结器结构、装置和实际应用效果进行评价.为在石油化工领域中液液-分离提供指导和借鉴作用,为实现经济、有效的分离
我院2004年5月至2009年2月用改良单开门椎管扩大成形术治疗颈椎管狭窄症,取得了较为满意的疗效,报告如下.  1 资料与方法  1.1 一般资料 2004年5月至2009年2月本院收治颈椎管狭窄患者65例,男41例,女24例.年龄最大79岁,最小53岁,平均63.7岁.病程9个月至12年,平均2.2年.其于多节段颈椎间盘突出退变(大于3个节段)45例,后纵韧带骨化症12例,多节段黄韧带肥厚并钙
[本刊讯]7月30日,蒙娜丽莎召开了“蒙娜丽莎陶瓷薄板专题沟通会”,广东省陶瓷协会会长陈环、华南理工大学教授兼蒙娜丽莎集团技术总顾问陈帆、蒙娜丽莎集团董事张旗康、研发部