按照某热电联产电厂一期2X400MW机组新建工程的要求,对岸边取水泵房下部结构的设计及施工方案进行了详细的论述,根据电厂现状条件和水文地质条件,对岸边取水泵房下部结构的设计及施工提出了可行、可靠的方案。
According to the request of a new 2 × 400 MW unit in a CHP plant, the design and construction scheme of the substructure of the water intake pumping station on the shore are discussed in detail. According to the current conditions of the power plant and the hydrogeological conditions, Structure design and construction put forward feasible and reliable solutions.