论文部分内容阅读
施工资料的编写、整理是施工工作的重要环节,是施工工作量和价值的体现。而施工日记的记录是施工资料中很重要的组成部分,是工程实施过程中最真实的工作证据,是记录人的素质、能力和技术水平的体现。所以施工日记的内容必须保证真实、全面,充分体现参建各方合同的执行程度。公正地记录好每天发生的工程情况是施工监督人员的重要职责。1 准确记录时间、气象施工监督人员在书写施工日记时,往往只重视时间记录,而忽视气象记录,其实气象记录的准确性和工程质量有直接的关系。1.1 混凝土强度、沙浆强度在不同气温的条件下的变化值有着明显的区别,施工监督人员可以根据混凝土浇捣时的温度及以后几天的气温变化,准确计算出强度的理论计算值,从而判断是否具备拆模条件,是否具备承载力,承载能力是多少。1.2 在地基与基础工程、主体工程、装饰工程、屋面工程等分部工程施工过程中,气象的变化直接影响工程的施工质量。有些工程在单位工程结束后出现一系列的质量问题,调查人员可根据问题的部位的施工日记作出分析,有的质量问题可能与气象有直接关系。2 作好现场巡查,真实、准确、全面地记录工程相关问题2.1 施工监督人员在书写施工日记之前,必须做好现场巡
The preparation and compilation of construction materials is an important part of the construction work, and is the embodiment of construction workload and value. The record of the construction diary is an important part of the construction materials, is the most true proof of work in the implementation of the project, is a manifestation of the recording of the quality, ability and technical level of people. Therefore, the contents of construction diary must be guaranteed to be true, comprehensive and fully reflect the implementation of the contract of all parties involved. It is an important responsibility of the construction supervisor to fairly record the daily engineering situation. 1 Accurately record the time, meteorological construction supervisors in the construction diary, often only focus on time records, while ignoring meteorological records, in fact, the accuracy of meteorological records and project quality has a direct relationship. 1.1 Concrete strength, mortar strength changes in different temperature conditions have obvious differences, construction supervisors can be poured concrete pounding temperature and temperature changes in the next few days, accurate calculation of the strength of the theoretical calculations to determine Whether with the demolition of mold conditions, whether they have the carrying capacity, carrying capacity is much. 1.2 In the foundation and foundation works, the main project, decoration works, roofing and other divisions of the project construction process, the changes in meteorology directly affect the construction quality of the project. Some projects in the unit after the end of a series of quality problems, investigators can be based on the site construction diary analysis, and some quality problems may have a direct relationship with the weather. 2 Make site inspections, true, accurate and comprehensive record of project-related issues 2.1 Construction supervisors in the construction diary before writing, must be on-site tour