事故配压阀误动的原因分析和改进措施

来源 :水电站机电技术 | 被引量 : 0次 | 上传用户:chly31
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、过速限制系统的动作条件葛洲坝二江分厂安装有五台ZZ500-LH-1020型转桨式水轮机,额定转速62.5转/分;配置JCST-200型电液调速器.除了调速器的正常控制、保护以外,还设计有过速限制系统,作为机组过速的一种保护.过速限制系统的原理图如图一所示,它由事故配压阀12、差动阀11、切换阀4、电磁配压阀3,9、液压阀5和备用油源(事故油罐)1等组成.它的动作条件是: First, over-speed limit system operating conditions Gezhouba Erjiang plant installed five ZZ500-LH-1020 Kaplan turbine, rated speed of 62.5 rev / min; configuration JCST-200 electro-hydraulic governor.In addition to speed In addition to the normal control and protection of the device, a over-speed limit system is also designed as a protection for the over-speed of the unit, and the schematic diagram of the over-speed limit system is shown in Figure 1. It consists of an accident pressure regulating valve 12 and a differential valve 11 , Switching valve 4, electromagnetic pressure regulating valve 3, 9, hydraulic valve 5 and spare oil source (accident tank) 1, etc. Its operating conditions are:
其他文献
在水库、水电站等工程中,对于弧形钢闸门的稳行性,根据弧门的构造可将主框架视为矩形、梯形和多层三角形框架进定分析。公式中考虑了防止漏水的止水橡皮的弹性抗力,分别采用
本文根据调节程序原理,对水泵水轮机在水轮机丢荷和水泵断电工况下的水锤控制方式进行了探讨;建议除应对水轮机进水侧的压力进行控制外,还应根据实际情况,或者控制水轮机出水
一、概况鲁布革水电站位于云南罗平县与贵州兴义县的交界处,是黄泥河的最后一个梯级电站。目前正在施工。电站为混合式开发,由首部枢纽和引水发电系统及地下厂房组成。装机6
自从4月份深圳市环保局宣布将于今年10月1日起,禁止市场销售含磷洗涤剂以来,不断地有相关精细化工产品的生产厂家前来深圳环保局咨询,这其中既有无磷洗涤剂的生产厂家,也有
日 期 展览会名称4~123H 美国高点国际室内装潢展览会 美国北卡罗来纳州 一5月1日 InternationalHome 高点23hpr.-1 May Furnishings Market High Point North Carolina U S.
(一)梯田发展简史梯田在我国有悠久的历史,早在西周,我国中原地区农业已有一定程度的发展,《诗经》中,就有“原隰既平,泉流既清”的诗句,反映了当时平治水土的情况。四川彭
粮食市场的形成改革开放之初,一些集贸市场开始零售粮食。以后,随着中央农业政策的调整,八十年代初期开始出现粮食贩运活动,八十年代中期开始出现个体粮食批发商。1989、1990、19
母语干扰对第二语言学习的影响长期以来一直是语言学家及外语教师所探讨的重要课题。今天,母语干扰在第二语言习得中的作用得到了广泛的承认,并已形成了较为全面的理论。结合
英语情态语义的两个次范畴,道义语义和认识语义有着界限模糊、非范畴化的特征。在英语部分方言中双情态(多情态动词)结构中,道义语义和认识语义的承载者通过语法结构的变化得
梯形水平明渠的水跃方程为(1)当明渠断面的边坡系数m,底宽b 和渠中的流量给定时,可由已知的一个共轭水深h_1(或h_2)来计算另一个未知的共轭水深h_2(或h_1),以往一般用试算法