Automated bolting and meshing on a continuous miner for roadway development

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:lml2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Automated installation of primary roof support material can potentially increase productivity and operator safety in the roadway development process within underground coal mining. Although the broader manufacturing sector has benefited from automation, several challenges exist within the Australian underground coal industry which makes it difficult to fully exploit these technologies. At the University of Wollongong a series of reprogrammable electromechanical manipulators have been designed to overcome these challenges and automatically handle the installation of roof and rib containment consumables on a continuous miner. The automated manipulation removes personnel from hazards in the immediate face area, particularly those associated with working in a confined and unstable working environment in close proximity to rotating and moving equipment. In a series of above ground trials the automated system was successfully demonstrated without human intervention and proven to be capable of achieving cycle times at a rate of 10 m per operating hour, consistent with that required to support high capacity longwall mines. The trials also identified a number of refinements which could further improve both cycle times and system reliability when considering the technology for underground use. The results have concluded that conventional manual handling practices on a continuous miner can be eliminated, and that the prototypes have significantly reduced the technical risk in proceeding to a full underground trial. Automated installation of primary roof support material can potentially increase productivity and operator safety in the roadway development process within underground coal mining. Which makes it difficult to fully exploit these technologies. At the University of Wollongong a series of reprogrammable electromechanical manipulators have been designed to overcome these challenges and automatically handle the installation of roof and rib containment consumables on a continuous miner. The automated manipulation solved personnel from hazards in the immediate face area, particularly those associated with working in a confined and unstable working environment in close confusion and unstable working environment in close confrontation to rotating and moving equipment. f achieving cycle times at a rate of 10 m per operating hour, consistent with that required to support high capacity longwall mines. The trials also identified a number of refinements which could further improve both cycle times and system reliability when considering the technology for underground use The results have concluded that conventional manual handling practices on a continuous miner can be eliminated, and that the prototypes have significantly reduced the technical risk in proceeding to a full underground trial.
其他文献
在传统矿山压力理论的基础上,用光纤Bragg光栅(FBG)传感器研究长壁工作面上覆岩层变形的“横三区”结构特征.在3 000mm×1 150mm×200mm的平面应力模型上模拟上覆岩层变形和
期刊
柳州市委党校以“中国特色的行政院校”为设计理念,最大限度地利用原有基地内的水体及地形地貌作为校园的造景有利元素,打造富有韵味的中式园林。黑白灰格调的中式建筑风格与中
大果99辣椒是湖南湘研种业有限公司选育推广的大果、早熟、浅绿色、薄皮泡椒品种,由于果实商品性好、膨大速度快、产量高、抗病毒病和疫病的能力强,大果99辣椒成为了秋延后栽
京红栗南瓜营养价值较高,含有丰富的膳食纤维、类胡萝卜素、维生素、矿物质元素和对人体有益的微量元素。其中含纤维18%,每100g鲜质量分别含类胡萝卜素5.9mg,VC2.4mg,K,Zn,Ca
本刊讯记者王艺静报道为弘扬中华建筑文化,保护和发展传统建筑,传承城市文脉和重塑各地城镇特色,引领行业创新发展,并充分发挥行业协会的职能作用和组织优势,中国勘察设计协会将正
我国是世界上自然灾害最严重的国家之一。全国70%以上的城市、半数以上的人口,分布在气象、地震、地质、海洋等自然灾害严重的地区。近年来,在全球气候变化背景下,自然灾害风险进
气测录井多是一种判断油气层的工作,也是检测油气勘探的重要手段.尽管气测录井在发现油气层以及评价油气层方面的作用非常重要,但是气测录井不能够完全的将地层中含油气的状
本刊讯记者吕俐报道近日,中国电子工程设计院(以下简称“电子院”)第三届科技创新大会在京召开。中国勘察设计协会理事长王素卿、工业和信息化部电子信息司司长丁文武、国投集团
目的分析探讨康复护理对小儿脑性瘫痪痉挛型偏瘫的临床效果。方法对郑州市儿童医院2015-02—2016-05收治的112例小儿脑性瘫痪痉挛型偏瘫患者进行研究,随机分为对照组和护理组