在毛主席的无产阶级革命路线指引下,在无产阶级文化大革命中,国产30万瓩双水内冷汽轮发电机组已胜利建成和并网发电。1000吨/时直流炉是30万瓩机组三大主机之一。锅炉水冷壁采用一次上升、中间二次混合管圈。这种管圈形式在国内还是首次使用。为了掌握其运行规律和安全可靠程度,自机组投运以来,曾进行过多次启动、低负荷、21万瓩和25万瓩负荷试验。在这些试验基础上于1976年6月又进行了高负荷(28万瓩)试验。本文介绍这次高负荷试验的情况和结果。28万瓩负荷试验表明,这种管圈的水动力特性是稳定的,水冷壁壁温工况良好,运行安全。试验还表明,这种管圈型式对燃烧反应很敏感。燃烧过程的组织与调整对水冷壁的温度工况和安全运行有密切的关系。
Guided by Chairman Mao's proletarian revolutionary line, in the Great Proletarian Cultural Revolution, the domestic 300,000 瓩 Shuangshui internally cooled turbo-generator set has been successfully completed and grid-connected power generation. 1000 tons / hour DC furnace is 300,000 units one of the three mainframe. Boiler water wall with a rise, the middle of the second mixing ring. This form of pipe is still the first time in the country. In order to grasp its operating rules and safety and reliability, since the unit put into operation, has carried out many starts, low load, 210,000 瓩 and 250,000 瓩 load test. On the basis of these tests, a heavy load (280,000 kg) test was carried out in June 1976. This article describes the conditions and results of this high-load test. 280,000 瓩 load test shows that the hydrodynamic characteristics of this coil is stable, the water wall wall temperature in good condition, safe operation. Experiments also show that this coil type is very sensitive to the combustion reaction. The organization and adjustment of the combustion process are closely related to the temperature conditions and safe operation of the water wall.