三峡临时船闸及升船机一线工程施工阶段监理投资控制

来源 :水利水电工程造价 | 被引量 : 0次 | 上传用户:zhangwahaha
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
三峡临时船闸及升船机一线工程土建投资约13亿元,为了做好施工阶段监理投资控制,监理中心首先将监理工程师职责分清,制订了关于施工阶段投资控制的监理实施细则和工作流程,使投资控制规范化和程序化;其次,注重搞好信息管理,及时收集、整理、分析投资控制数据,搞好施工方案优化,加强工程计量与支付管理,以控制好工程变更和索赔。 In order to do a good job in investment supervision during the construction phase, the supervision center first clarifies the responsibilities of supervision engineers and formulates the detailed implementation rules and work flow of supervision on investment control during the construction phase so that the construction investment in the first-line project of the Three Gorges temporary lock and shiplift will be about 1.3 billion yuan Investment control standardization and program; Second, pay attention to improving information management, timely collection, collation, analysis of investment control data, improve the construction program optimization, strengthen project measurement and payment management, in order to control the engineering changes and claims.
其他文献
伊斯兰发展银行计划投资20.4亿美元,将位于苏门答腊岛北部印度尼西亚的Belawan港的Gabion集装箱码头发展成为国际枢纽港。印度尼西亚商报报道,伊斯兰发展银行做出这一决定,主
一、加强创新意识、创新能力、创业责任,是市场经济条件下企业求生存、求发展的必然选择人类已经进入新世纪。21世纪是全球经济高度一体化、知识经济得以充分发挥和展现的新
“上海隧道公司在大型隧道项目中占有90%以上的份额,在国际上也具有很强的竞争力,在新加坡在建地铁市场中占有率达到40%以上。我们之所以能够取得这样的好成绩,与开展质量认
本文简要介绍了在寒冷地区采用土工格栅加筋碎石垫层进行过湿路段处理的方法,以及这种方法解决土基发生工后不均匀沉降和冻胀问题所达到的效果,阐明了这种方法在寒区进行推广