摘要: 一个工程项目从立项、规划、设计、审核到施工,乃至竣工验收、资料归档管理,整个流程环环相扣,任何环节都不能有丝毫闪失,否则所引起的损失都是难以估量的。而施工现场管理则是工程项目管理的核心,所谓施工现场管理,就是运用先进的管理思想,对现场各个要素进行合理有序的组织和安排,使得施工组织变得有序和高效,有利于实现文明生产和文明施工,有利于保证施工安全,提高施工质量。因此,合理的施工现场管理,是建筑施工取得成功、建筑质量优异的有力保证。
关键词:建筑工程;现场施工;管理方法
Abstract: A project from the project, planning, design, construction and completion of acceptance to audit,, data archiving, the entire process chain, any link can not have the slightest mistake, otherwise the losses are incalculable. And the construction site management is the core of the project management, the construction site management, is the use of advanced management idea, organize and arrange orderly on the various elements of the site, construction organization become orderly and efficient, conducive to the realization of production of civilization and civilized construction, to ensure the safety of construction, improve construction quality. Therefore, the construction site management, construction project is successful, powerful guarantee for building high quality.
Key words: construction engineering; construction site; management method
中圖分类号:TU71 献标识码:文章编号:2095-2104(2013)1-0020-02
工程建设项目实施阶段即施工阶段是把设计图纸和原材料、半成品、设备等变成工程实体的过程,是实现建设项目价值和使用价值的主要阶段。施工现场管理是工程项目管理的关键部分,只有加强施工现场管理,才能保证工程质量、降低成本、缩短工期,提高建筑企业在市场中的竞争力,对建筑企业生存和发展起着重要作用。
1 加强现场施工质量监督
1.1指令文件控制,即监理通过书面形式对施工承包单位提出其所需完成的建筑任务,指出施工单位存在的问题,明确施工单位的责任;
1.2 驻地监督控制,在施工现场中观察工程的变更过程,及时处理有质量隐患的事故,对有危险苗头的项目予以重视并上报监理人员;
1.3 实验控制,监理工程师判定材料和各工程项目品质是以现场实验数据作为评判标准的,分部工程中的每道程序所用材料的物理、化学性能,结构的抗拉、压、弯各项强度及拌料的配合比,通常需利用现场实验所7得数据来评判质量、情况;
1.4 测量控制,施工前监理人员对施工放线及高程控制进行检查,对质量建筑实体所能出现的容许误差作出严格的控制,在施工过程中,应对工程体的几何尺寸、高程校核等随时进行检查,对不合乎工程实体基本测量要求者,应及时指令施工单位处理;
1.5 利用支付手段控制,施工单位未能全部按监理工程师指令进行施工,当工程质量部分出现问题从而达不到要求的标准时,监理工程师有权拒绝支付工程款,显然这种控制是直接有效的手段。
工程质量检查一般采用现场生产工人自检、互检和专职检查人员相结合的方式,其依据为国家或部门颁发的工程施工验收及验收规范、工程施工技术操作规范、工程质量检验评定标准。从原料进场、各施工单位工序构配件的生产到工程竣工等全过程都必须在现场项目施工中进行质量检验。
2 加强人员管理
人是指直接参与工程施工的组织者、指挥者和操作者。在施工前要审查承包单位的技术资质,看其是否具有按期完成工程任务并确保工程质量的技术能力及管理水平。近几年来,由于建设规模迅速扩大,大量农民工涌入建筑队伍行列,这些人的素质较差,对建筑队伍的整休素质有较大影响。有的承包单位技术人员少,技术力量薄弱。现场施工管理要以“人为核心”,以人的工作质量保证工序质量,提高现场施工管理水平。
同时,要健全工程质量监督机构,提高质量监督人员素质水平。现场施工应有明确职责,以一个口径说话,统一处理施工现场的全部问题,管理人员要逐步适应建设管理的需要,努力学习工程管理的新知识、新技术、提高自身的素质水平。
只有拥有一支富有创造力的、纪律严明的施工队伍才能完成一项质量优良的工程项目。怎样才能将施工队伍中的技术管理人员和技术工人有机地捏合成近卫军呢?首先,必须营造出一种荣辱与共的氛围,职责分明但不失亲和力,让所有的员工都感到自己是这个项目的大家庭中的一员。这一些,就需要我们施工现场管理人员充分发挥自己的才智,对工人要奖罚分明,多鼓励、多举办各类生产生活竞赛活动,从精神、物质上双管齐下,培养凝聚力。其次,必须明确施工队伍的管理体制,各岗位职责,权利明确,做到令出必行。一支纪律严明的施工队伍,面对工期紧逼,技术复杂的工程,只有坚决服从指挥,才能按期保质完成施工任务。
3 加强材料管理
材料(包括原材料、成品、半成品、构配件)是工程施工的物质条件,材料质量是工程质量的基础,所以加强材料的质量控制,是工程质量的重要保证。其内容主要是严格检查验收,正确公道地使用,建立台帐,进行收、发、储、运等各环节的记录,避免混料和将不合格的原材料使用到工程上。
项目施工中材料费用在建筑产品投人所占的比例很重,一般为60%-70%。因而搞好现场材料管理,可以加速流动资金的周转,减少流动资金占用,充分发挥流动资金的经济效益。从建筑材料进入施工现场到施工结束清理现场为止的全过程所进行的材料管理,均为现场施工材料管理,其内容包括:材料计划管理、材料进场验收、材料的储存与保管、材料领发、监督材料使用和材料的回收。
施工单位在施工前,对工程所需材料不仅要进行货源的调查研究,广泛收集供货信息,尽量寻找货和价的最佳结合点,而且还要根据施工组织设计及有关计算实际需要的材料、设备总量,编制好需求计划。在施工中做好旬、月计划,要充分考虑资金的合理运转和现场场地实际情况以及工程进度需要,合理安排施工所需机械的进退场,特别要注意材料的保管,以免出现如水泥在保管中因违规堆放出现受潮及底层结块、钢筋未垫好而出现锈蚀导致不能使用等现象,避免不必要的浪费。制定合理的材料采购、保管制度,建立材料价格信息中心和材料价格监管机制,提高采购人员的自身素质和业务水平,保证货比三家,质优价廉的购买材料,减少工程成本,提高企业利润。
4 加强机械管理
施工阶段必须综合考虑施工现场条件、建筑结构形式、施工工艺和方法、建筑技术难易程度等合选择机械的类型和件能参数,合理使用机械设备,正确地操纵。操纵职员必须认真执行各项规章制度,严格遵守操纵规程,并加强对施工机械的维修、保养、治理。
4.1 指派专人负责机械设备的管理。做好现场管、用、养、修、算、各项原始资料和数据的统计、积累,并按规定及时、准确向主管领导上报使用及经济分析资料,以便提供领导掌握设备使用情况,及时调整使用方案。4.2 设置适应项目施工所需的设备管理岗位,配备专业技术人员,加强机操人员的技能、职责和安全教育。机操人员应服从项目的统一指挥,履行岗位职责,树立为施工现场服好务的思想。4.3 加强设备状态监测。对使用频率高、易损坏、出故障的设备,应加强跟踪诊断,由事后修理转为事前的视情修理。做好设备故障预测,及时发现问题,及早采取措施,提前整修。项目对租用的设备在使用台班调期内,应进行强制性定期维护、保养。设备维修保养要切实做到“资金、人员、时间”三落实,以确保设备的使用完好和正常运行。 设备检查、指导,相互反馈信息、沟通情况。对违章,不按章办事的进行处罚,以加强机管人员对设备维护保养的自觉性,以完好设备的使用来促进生产质量的提高。5 加强施工方法管理
施工过程中的方法包含整个建设周期内所采取的技术方案、工艺流程、组织措施、检测手段、施工组织设计等。施工方案正确与否,直接影响工程质量控制能否顺利实现。往往由于施工方案考虑不周而拖延进度,影响质量,增加投资。为此主要应切合工程实际、能解决施工困难、技术可行、经济公道,有利于保证质量、加快进度、降低成本。
如何能合理的选择施工方法,这要求我们作为现场施工管理人员务必做好技术准备,首先,必须熟悉施工图纸,针对具体的施工合同要求,尽最大限度去优化每一道工序,每一分项(部)工程,同时考虑自身的资源(施工队伍、材料供应、资金、设备等)和气候等条件,认真、合理地做好施工组织计划,并以横道图或图表表示出来,从大到小,由面及点,确保每一分项工程能纳入受控范围之内。其次,针对工程特点,除了合理的施工组织计划外,还必须在具体的施工工艺上作好技术准备,特别是高新技术要求的施工工艺。
6 加强现场环境管理
影响工程质量的环境因素较多,有工程地质、水文、气象、通风、污染等。环境因素对工程质量的影响具有复杂而多变的特点,如气象条件就变化万千,温度、湿度、大风、暴雨、酷暑、严寒都直接影响工程质量,往往前一工序就是后一工序的环境,前一分项、分部工程也就是后一分项、分部工程的环境。因此,根据工程特点和具体条件,应对影响质量的环境因素,采取有效的措施严加控制。尤其是施工现场,如混凝土工程、土方工程、水下工程及高空作业等,应拟定季节性保证施工质量的有效措施,以免工程质量受到冻害、干裂、冲洗等的危害。同时应建立文明施工和文明生产的环境,保持材料工件堆放有序,道路畅通,工作场所清洁整洁,施工程序井井有条,为确保质量、安全创造良好条件。
7 加强现场安全管理
施工安全管理,就是施工项目在施工过程中,组织安全生产的全部管理活动。施工现场是个动态的多工种立体作业,生产设施的临时性、作业环境的多变性、人机的流动性,形成了人、机、料的动态集中,导致安全隐患的大量存在。
施工现场施工事故多发的作业现场,控制人的不安全行为和物的不安全状态,落实安全管理决策和目标,以消除一切事故,避免事故伤害,减少事故损失为管理目的,是施工现场安全管理的重点。直接从事施工操作的人经常受到确定或不确定的危险因素威胁和伤害,并且认为操作随着自身事物或施工器械的运作故障,造成人员伤亡和建材損失,将导致工期延误,达不到工期的预期效果,最终将损害到施工企业的经济效益。施工安全管理,要从安全教育、检查、生产责任制与管理保证体系等方面展开。
意识的能动性是不可忽视的。施工企业应从上至下地开展安全教育,普及安全知识,加强安全意识,要形成全员、全过程、全企业施工生产过程的群体强化施工现场安全意识,提升安全与效率、效益的辨证统一的关系。企业应从宣传安全生产方针政策法规教育,生产、专业等安全技术知识教育等方面,不断升华企业职工的施工现场的安全意识。通过加强现场安全巡逻,建立安全监督网,完善现场安全措施等,来保证安全生产。
8 加强资料管理
施工资料是施工过程的记录,是每一工序、分项、分部工程的实体质量合格文件。监理工程师对工程的验收就是在审核施工资料的基础上,对工程实体进行检查,以验证施工资料的真实性。施工资料不符合要求,则工程实体质量就无从谈起。我们对工程实体的质量控制是从工序、分项、分部工程依次做起,同样对施工资料的质量控制也应从工序、分项、分部工程做起。细分目标,步步把关。对施工资料的管理是一项重要的工作内容。
一个项目的管理,除了材料、施工、技术、人员的管理,还有个不容忽视的问题就是资料的管理。任何项目的验收,都必须有个竣工资料这一项。竣工资料所包含的材料合格证、检验报告、竣工图、验收报告、设计变更、测量记录、隐蔽工程验收单,有关技术参数测定验收单、工作联系函、工程签证等等,都要求我们在整个项目施工过程中要一一注意收集归类存档。如有遗漏,将对竣工验收和项目结算带来不必要的损失。
结 论
施工现场的管理是一项较为复杂、多头绪的工作,必须考虑周全,才能按时保质地完成施工任务。随着建筑行业突飞猛进的发展,社会发展的新要求,建筑市场竞争激烈,高手如林,建筑施工企业,靠的是市场,要站稳市场,只有从施工现场综合管理为突破口,强化现场管理,提高工程质量,确保安全生产,树立较好的企业社会形象,赢得社会的信誉,最终企业才能生存和发展。
关键词:建筑工程;现场施工;管理方法
Abstract: A project from the project, planning, design, construction and completion of acceptance to audit,, data archiving, the entire process chain, any link can not have the slightest mistake, otherwise the losses are incalculable. And the construction site management is the core of the project management, the construction site management, is the use of advanced management idea, organize and arrange orderly on the various elements of the site, construction organization become orderly and efficient, conducive to the realization of production of civilization and civilized construction, to ensure the safety of construction, improve construction quality. Therefore, the construction site management, construction project is successful, powerful guarantee for building high quality.
Key words: construction engineering; construction site; management method
中圖分类号:TU71 献标识码:文章编号:2095-2104(2013)1-0020-02
工程建设项目实施阶段即施工阶段是把设计图纸和原材料、半成品、设备等变成工程实体的过程,是实现建设项目价值和使用价值的主要阶段。施工现场管理是工程项目管理的关键部分,只有加强施工现场管理,才能保证工程质量、降低成本、缩短工期,提高建筑企业在市场中的竞争力,对建筑企业生存和发展起着重要作用。
1 加强现场施工质量监督
1.1指令文件控制,即监理通过书面形式对施工承包单位提出其所需完成的建筑任务,指出施工单位存在的问题,明确施工单位的责任;
1.2 驻地监督控制,在施工现场中观察工程的变更过程,及时处理有质量隐患的事故,对有危险苗头的项目予以重视并上报监理人员;
1.3 实验控制,监理工程师判定材料和各工程项目品质是以现场实验数据作为评判标准的,分部工程中的每道程序所用材料的物理、化学性能,结构的抗拉、压、弯各项强度及拌料的配合比,通常需利用现场实验所7得数据来评判质量、情况;
1.4 测量控制,施工前监理人员对施工放线及高程控制进行检查,对质量建筑实体所能出现的容许误差作出严格的控制,在施工过程中,应对工程体的几何尺寸、高程校核等随时进行检查,对不合乎工程实体基本测量要求者,应及时指令施工单位处理;
1.5 利用支付手段控制,施工单位未能全部按监理工程师指令进行施工,当工程质量部分出现问题从而达不到要求的标准时,监理工程师有权拒绝支付工程款,显然这种控制是直接有效的手段。
工程质量检查一般采用现场生产工人自检、互检和专职检查人员相结合的方式,其依据为国家或部门颁发的工程施工验收及验收规范、工程施工技术操作规范、工程质量检验评定标准。从原料进场、各施工单位工序构配件的生产到工程竣工等全过程都必须在现场项目施工中进行质量检验。
2 加强人员管理
人是指直接参与工程施工的组织者、指挥者和操作者。在施工前要审查承包单位的技术资质,看其是否具有按期完成工程任务并确保工程质量的技术能力及管理水平。近几年来,由于建设规模迅速扩大,大量农民工涌入建筑队伍行列,这些人的素质较差,对建筑队伍的整休素质有较大影响。有的承包单位技术人员少,技术力量薄弱。现场施工管理要以“人为核心”,以人的工作质量保证工序质量,提高现场施工管理水平。
同时,要健全工程质量监督机构,提高质量监督人员素质水平。现场施工应有明确职责,以一个口径说话,统一处理施工现场的全部问题,管理人员要逐步适应建设管理的需要,努力学习工程管理的新知识、新技术、提高自身的素质水平。
只有拥有一支富有创造力的、纪律严明的施工队伍才能完成一项质量优良的工程项目。怎样才能将施工队伍中的技术管理人员和技术工人有机地捏合成近卫军呢?首先,必须营造出一种荣辱与共的氛围,职责分明但不失亲和力,让所有的员工都感到自己是这个项目的大家庭中的一员。这一些,就需要我们施工现场管理人员充分发挥自己的才智,对工人要奖罚分明,多鼓励、多举办各类生产生活竞赛活动,从精神、物质上双管齐下,培养凝聚力。其次,必须明确施工队伍的管理体制,各岗位职责,权利明确,做到令出必行。一支纪律严明的施工队伍,面对工期紧逼,技术复杂的工程,只有坚决服从指挥,才能按期保质完成施工任务。
3 加强材料管理
材料(包括原材料、成品、半成品、构配件)是工程施工的物质条件,材料质量是工程质量的基础,所以加强材料的质量控制,是工程质量的重要保证。其内容主要是严格检查验收,正确公道地使用,建立台帐,进行收、发、储、运等各环节的记录,避免混料和将不合格的原材料使用到工程上。
项目施工中材料费用在建筑产品投人所占的比例很重,一般为60%-70%。因而搞好现场材料管理,可以加速流动资金的周转,减少流动资金占用,充分发挥流动资金的经济效益。从建筑材料进入施工现场到施工结束清理现场为止的全过程所进行的材料管理,均为现场施工材料管理,其内容包括:材料计划管理、材料进场验收、材料的储存与保管、材料领发、监督材料使用和材料的回收。
施工单位在施工前,对工程所需材料不仅要进行货源的调查研究,广泛收集供货信息,尽量寻找货和价的最佳结合点,而且还要根据施工组织设计及有关计算实际需要的材料、设备总量,编制好需求计划。在施工中做好旬、月计划,要充分考虑资金的合理运转和现场场地实际情况以及工程进度需要,合理安排施工所需机械的进退场,特别要注意材料的保管,以免出现如水泥在保管中因违规堆放出现受潮及底层结块、钢筋未垫好而出现锈蚀导致不能使用等现象,避免不必要的浪费。制定合理的材料采购、保管制度,建立材料价格信息中心和材料价格监管机制,提高采购人员的自身素质和业务水平,保证货比三家,质优价廉的购买材料,减少工程成本,提高企业利润。
4 加强机械管理
施工阶段必须综合考虑施工现场条件、建筑结构形式、施工工艺和方法、建筑技术难易程度等合选择机械的类型和件能参数,合理使用机械设备,正确地操纵。操纵职员必须认真执行各项规章制度,严格遵守操纵规程,并加强对施工机械的维修、保养、治理。
4.1 指派专人负责机械设备的管理。做好现场管、用、养、修、算、各项原始资料和数据的统计、积累,并按规定及时、准确向主管领导上报使用及经济分析资料,以便提供领导掌握设备使用情况,及时调整使用方案。4.2 设置适应项目施工所需的设备管理岗位,配备专业技术人员,加强机操人员的技能、职责和安全教育。机操人员应服从项目的统一指挥,履行岗位职责,树立为施工现场服好务的思想。4.3 加强设备状态监测。对使用频率高、易损坏、出故障的设备,应加强跟踪诊断,由事后修理转为事前的视情修理。做好设备故障预测,及时发现问题,及早采取措施,提前整修。项目对租用的设备在使用台班调期内,应进行强制性定期维护、保养。设备维修保养要切实做到“资金、人员、时间”三落实,以确保设备的使用完好和正常运行。 设备检查、指导,相互反馈信息、沟通情况。对违章,不按章办事的进行处罚,以加强机管人员对设备维护保养的自觉性,以完好设备的使用来促进生产质量的提高。5 加强施工方法管理
施工过程中的方法包含整个建设周期内所采取的技术方案、工艺流程、组织措施、检测手段、施工组织设计等。施工方案正确与否,直接影响工程质量控制能否顺利实现。往往由于施工方案考虑不周而拖延进度,影响质量,增加投资。为此主要应切合工程实际、能解决施工困难、技术可行、经济公道,有利于保证质量、加快进度、降低成本。
如何能合理的选择施工方法,这要求我们作为现场施工管理人员务必做好技术准备,首先,必须熟悉施工图纸,针对具体的施工合同要求,尽最大限度去优化每一道工序,每一分项(部)工程,同时考虑自身的资源(施工队伍、材料供应、资金、设备等)和气候等条件,认真、合理地做好施工组织计划,并以横道图或图表表示出来,从大到小,由面及点,确保每一分项工程能纳入受控范围之内。其次,针对工程特点,除了合理的施工组织计划外,还必须在具体的施工工艺上作好技术准备,特别是高新技术要求的施工工艺。
6 加强现场环境管理
影响工程质量的环境因素较多,有工程地质、水文、气象、通风、污染等。环境因素对工程质量的影响具有复杂而多变的特点,如气象条件就变化万千,温度、湿度、大风、暴雨、酷暑、严寒都直接影响工程质量,往往前一工序就是后一工序的环境,前一分项、分部工程也就是后一分项、分部工程的环境。因此,根据工程特点和具体条件,应对影响质量的环境因素,采取有效的措施严加控制。尤其是施工现场,如混凝土工程、土方工程、水下工程及高空作业等,应拟定季节性保证施工质量的有效措施,以免工程质量受到冻害、干裂、冲洗等的危害。同时应建立文明施工和文明生产的环境,保持材料工件堆放有序,道路畅通,工作场所清洁整洁,施工程序井井有条,为确保质量、安全创造良好条件。
7 加强现场安全管理
施工安全管理,就是施工项目在施工过程中,组织安全生产的全部管理活动。施工现场是个动态的多工种立体作业,生产设施的临时性、作业环境的多变性、人机的流动性,形成了人、机、料的动态集中,导致安全隐患的大量存在。
施工现场施工事故多发的作业现场,控制人的不安全行为和物的不安全状态,落实安全管理决策和目标,以消除一切事故,避免事故伤害,减少事故损失为管理目的,是施工现场安全管理的重点。直接从事施工操作的人经常受到确定或不确定的危险因素威胁和伤害,并且认为操作随着自身事物或施工器械的运作故障,造成人员伤亡和建材損失,将导致工期延误,达不到工期的预期效果,最终将损害到施工企业的经济效益。施工安全管理,要从安全教育、检查、生产责任制与管理保证体系等方面展开。
意识的能动性是不可忽视的。施工企业应从上至下地开展安全教育,普及安全知识,加强安全意识,要形成全员、全过程、全企业施工生产过程的群体强化施工现场安全意识,提升安全与效率、效益的辨证统一的关系。企业应从宣传安全生产方针政策法规教育,生产、专业等安全技术知识教育等方面,不断升华企业职工的施工现场的安全意识。通过加强现场安全巡逻,建立安全监督网,完善现场安全措施等,来保证安全生产。
8 加强资料管理
施工资料是施工过程的记录,是每一工序、分项、分部工程的实体质量合格文件。监理工程师对工程的验收就是在审核施工资料的基础上,对工程实体进行检查,以验证施工资料的真实性。施工资料不符合要求,则工程实体质量就无从谈起。我们对工程实体的质量控制是从工序、分项、分部工程依次做起,同样对施工资料的质量控制也应从工序、分项、分部工程做起。细分目标,步步把关。对施工资料的管理是一项重要的工作内容。
一个项目的管理,除了材料、施工、技术、人员的管理,还有个不容忽视的问题就是资料的管理。任何项目的验收,都必须有个竣工资料这一项。竣工资料所包含的材料合格证、检验报告、竣工图、验收报告、设计变更、测量记录、隐蔽工程验收单,有关技术参数测定验收单、工作联系函、工程签证等等,都要求我们在整个项目施工过程中要一一注意收集归类存档。如有遗漏,将对竣工验收和项目结算带来不必要的损失。
结 论
施工现场的管理是一项较为复杂、多头绪的工作,必须考虑周全,才能按时保质地完成施工任务。随着建筑行业突飞猛进的发展,社会发展的新要求,建筑市场竞争激烈,高手如林,建筑施工企业,靠的是市场,要站稳市场,只有从施工现场综合管理为突破口,强化现场管理,提高工程质量,确保安全生产,树立较好的企业社会形象,赢得社会的信誉,最终企业才能生存和发展。