弯线复盖的方法一提出,南方多山地区许多地震队都在积极试验和推广。但目前的报告中对计算方法、处理程序讨论较多,对施工中的参数如何确定则未讨论。为此试图讨论施工中经常遇到的几个参数,供野外施工时参考。施工中检波点距的确定目前国内实现弯线复盖的程序都是使用“共反射面元”的概念,为简便计算,“共反射面元”总是被设计成正方形。如CYBER—1724机的“ETQXY”模块和包吉山
The method of covering curved lines suggests that many seismic teams in the mountainous South China are actively testing and promoting them. However, in the current report, there are many discussions on the calculation methods and processing procedures, and no discussion is given on how to determine the parameters in construction. To this end, trying to discuss several frequently encountered parameters for the construction of the field when the reference. Confirmation of Detecting Pitch in Construction At present, the procedure of realizing the coverage of curve lines in China is to use the concept of “common reflector facet”. For simple calculation, “Common reflector facet” is always designed as a square. Such as the CYBER-1724 machine “ETQXY” module and Baoji Mountain