论文部分内容阅读
煤矿生产建设是包含多个和多级子系统的复杂的动态系统。因为这个动态系统是由多个和多级子系统有机结合的整体,因而具有整体性;各个和各级子系统是相互关联的,故又具有相关性;系统的影响因素繁多,而且多具有随机性。应用计算机模拟法,对矿井或其子系统进行动态模仿,能够较好的体现上述特点,对所研究的系统得出科学的结论。因此,计算机模拟被称为管理人员的实验室。它是加速煤矿生产建设及实现煤矿现代化的有力武器。国外矿业界采用计算机模拟已有30年的历史,1951年美国宾西法尼亚州的矿山企业开始采用计算机模拟法。目前应用已比较广泛,各种领域均有应用,近来又用来模拟整
Coal mine production construction is a complex dynamic system that contains multiple and multi-level subsystems. Because this dynamic system is composed of a plurality of multi-level subsystem and organically integrated, and therefore has the integrity; each and all levels of subsystems are interrelated, it is also relevant; the system has many influencing factors, and more with random Sex. Using computer simulation method, the mine or its subsystems can be imitated dynamically, which can reflect the above characteristics well and draw a scientific conclusion for the system under study. Therefore, computer simulation is called the manager’s lab. It is a powerful weapon to speed up coal production and construction and realize the modernization of coal mines. Foreign mining industry has adopted computer simulation of 30 years of history, in 1951, the United States, Pennsylvania, mining companies began using computer simulation method. The current application has been more extensive, has applications in various fields, and recently used to simulate the whole