一、节能的成果该矿目前现有的主要生产设备最高可处理38,000吨原矿。随着产量的压缩,工作效率方面存在很多问题,单位耗电量的升高就是其中的一个问题。为了解决这个问题,从设备本身及其运转情况这两方面进行了合理化研究。1979年11月电费涨价高达53%,1980年2月以后,电费又大幅度涨价42%。电费占本矿生产费用16.2%,合理化的目标面临着电费涨价这个问题。另外,自石油危机以来,锅炉用的柴油不仅提高了价格,而且在供应方面也受到限
First, energy-saving results The mine currently has the main production equipment can handle up to 38,000 tons of ore. With the compression of production, there are many problems in work efficiency, and the increase of unit power consumption is one of the problems. In order to solve this problem, rationalization has been carried out on both the equipment itself and its operation. November 1979 electricity prices as high as 53%, after February 1980, electricity prices have sharply increased prices 42%. Electricity costs accounted for 16.2% of the mine production costs, the rationalization of the target facing the issue of electricity prices. In addition, since the oil crisis, diesel for boilers has not only raised prices but also been limited in terms of supply