0概述万安水电站是江西赣江干流上第一个大型水电站,也是江西电网的主力电站,电站装有5台100MW的轴流式水轮发电机组。电站最大水头32.3m,设计水头22m。电站一号机为发变单元结线,接入110kV系统;二号机经自耦变接入nokV和220by系统;三至五号机为发变单元结线接人220kV电
0 Overview Wan’an Hydropower Station is the first large hydropower station on the Ganjiang River in Jiangxi Province and also the main power station of Jiangxi Power Grid. The station is equipped with 5 sets of 100MW axial-flow hydro-generating sets. The maximum power head 32.3m, design head 22m. Unit 1 on behalf of the transformer power unit winding line, access 110kV system; on the 2nd machine by self-coupling into the nokV and 220by system;