论文部分内容阅读
20 0 2年 10月 18日 ,在山西省宁武县头马营引黄入晋工程南干出口 ,彩旗飘扬 ,锣鼓喧天 ,滔滔黄河水从万家寨水利枢纽经过五级泵站 ,被提高 6 36m ,穿越 2 85km ,以 6 4m3 /s的流量 ,顺利到达太原市 ,引黄一期工程试通水一次成功。全国政协副主席任建新、陈锦华 ;全国人?
On October 18, 2002, at the headwatershed of Ma Ma Ying-Nien County, Shanxi Province, the Yellow River diversion project was carried out at the southern exit of Ganjin City. Colorful flags flying and gongs and drums roaring, and the Yellow River water from the Wanjiazhai Water Control Project passed through the fifth-grade pumping station. 6 36m, through 2 85km, with a flow of 6 4m3 / s, successfully arrived in Taiyuan City, the first phase of the Yellow River pilot project a pilot success. Ren Jianxin, Chen Jinhua, vice chairman of the CPPCC National Committee;