论文部分内容阅读
【世界核新闻网站2014年11月26日报道】地平线核电公司(Horizon Nuclear Power)近日与英国核监管办公室(ONR)签署了一份协议,为该公司购买威尔法核电项目所需的长周期设备铺平了道路。长周期设备是制造时间长并且在建设阶段初期就需要的反应堆设备,例如反应堆压力容器、冷却剂泵、安全壳等。地平线核电将向核监管办公室通报威尔法核电项目的设备采购进度表,并编制长
Horizon Nuclear Power has signed an agreement with the Nuclear Regulatory Agency (ONR) recently to buy the company a long period of time required for a Willfar nuclear power project Equipment paved the way. Long-cycle devices are reactor devices that are long manufactured and needed early in the construction phase, such as reactor pressure vessels, coolant pumps, containment vessels, and the like. Horizon Nuclear Power will inform the Nuclear Regulatory Office of the equipment procurement schedule of the Wilfa Nuclear Power Project and prepare a long