我市某焦化厂35kV变电所原来采用一线带一变,高供高计,2009年底该厂引进外资,扩大生产规模,原来供电容量及方式不符合将来生产条件及要求,而且该工程具有很大的特殊性,外商合同要求在规定的时间内,焦化厂供电必须具备双电源供电,供电靠性要高。
The 35kV substation of a certain coking plant in our city originally used a stripline with a high level for the project. At the end of 2009, the factory introduced foreign investment and expanded the scale of production. The original power supply capacity and mode did not meet the requirements of future production conditions and the project was very Large special, foreign contract requirements within the stipulated time, coking plant power supply must have dual power supply, power supply reliability is higher.