论文部分内容阅读
广西合山电厂第一台2.5万千瓦机组于1971年建成投产,经几度扩建,目前装机52.5万千瓦,是广西目前已建的最大火电厂。一、地基沉陷的经过 1972年1月5日,原空压机房西面墙体的内墙上角和西面墙基发生裂缝。过了两天,裂缝继续扩大,2#3#除尘器的筒身及个别柱发生裂缝。至1月15日原空压机房西面墙基裂缝宽达11~15毫米,室内的右窗角已裂开26毫米,有倾倒之势。2号炉3#除尘器筒身裂缝宽20~25毫米,长5.54米,靠2#除尘器的边柱裂开12~30毫米,1号炉2#除尘器的边柱发生裂缝,在约150平方米的范围内,地面均处于不断的沉降之中。
Guangxi Heshan Power Plant first 25,000 kilowatts units put into operation in 1971, after several expansion, the current installed capacity of 525,000 kilowatts, Guangxi is currently the largest thermal power plant has been built. First, the subsidence of the foundation After January 5, 1972, the original wall of the air compressor room west corner of the wall and the West Wall cracks. After two days, the cracks continued to expand. Cracks occurred in the barrel and individual columns of 2 # 3 # precipitator. To January 15 the original air compressor room west wall base crack width of 11 to 15 mm, the indoor right window corner has been split 26 mm, the tendency to dump. No.2 furnace 3 # dust collector barrel crack width 20 ~ 25 mm, length 5.54 meters, by 2 # side edge of the precipitator 12 ~ 30 mm split, 1 # 2 # 2 precipitator side column cracks, at about 150 square meters of range, the ground are in constant settlement.