论文部分内容阅读
After examination to the former dissolving system device built in the 02Bhot cell in CRARL facility,there are some trouble including:1)The crowded space lead to the invalidated operation for the valves and fast connectors by the manipulator and the absence of partial equipment.2)In case of plugging up,the experiment would be
After examination to the former dissolving system device built in the 02Bhot cell in CRARL facility, there are some trouble including: 1) The crowded space lead to the invalidated operation for the valves and fast connectors by the manipulator and the absence of partial equipment.2 In case of plugging up, the experiment would be