论文部分内容阅读
塑料板排水法在软基处理中的应用江苏电建三公司张德平一、概述中外合资的江苏利港电厂主要由意大利GIE公司设计、供货,华东电力设计院作配套设计。规划装机容量2600Mw,一期工程安装4×350MW。四台机组的输煤系统一次设计施工。煤场紧靠长江南岸,东西长...
Application of Plastic Plate Drainage Method in Soft Ground Treatment Jiangsu Dejiansan Company Zhang Deping I. Overview Sino-foreign joint venture Jiangsu Ligang Power Plant is mainly designed and supplied by Italian GIE Corporation and East China Electric Power Design Institute for supporting design. The planned installed capacity is 2,600MW and the first phase of the project is 4×350MW. The coal transportation system of the four units was once designed and constructed. The coal yard is close to the south bank of the Yangtze River, east and west...