论文部分内容阅读
基于淮河干流河道治理工程中引入价值工程研究模式,选择香浮段行洪区调整和建设工程作为价值工程的研究对象,将施工准备阶段作为切入口,以河道疏浚工程排泥场布置等相关问题为研究重点,通过功能分析和方案创造,用合理的最小工程成本,实现综合最优的河道治理功能价值,并将研究成果直接应用于工程建设实践,达到优化设计和实施方案、节约工程投资的成效。
Based on the introduction of the value engineering research mode in the Huaihe river regulation project and the adjustment and construction project of the Hong Hong flooding and flood area as the research object of the value engineering, the construction preparation stage is taken as the cut-in entrance and the disposal of the discharge field of the river dredging project is studied Focusing on functional analysis and program creation, the integrated and optimal value of river management functions can be achieved with reasonable minimum project cost, and the research results can be applied directly to project construction practice to optimize the design and implementation plan and save the project investment.