兖州矿业(集团)公司济宁二号煤矿4304(北)综采工作面为四采区边角煤开采工作面,各生产系统均利用六采区生产系统,但六采区水仓当时尚未施工故不能形成排水系统。根据以往经验,施工装备一个永久水仓至少要0.5 a。他们利用大口径聚丙烯管道配合法兰盘连接,在六采区皮带下山与4304(北)综采面皮带机头东侧安装组装式水仓。
The 4304 (North) fully mechanized coal face of Jining No.2 Coal Mine of Yanzhou Mining (Group) Company is the face coal mining face in No.4 mining area. All production systems utilize the production system of No.6 mining area, but the water storage of No.6 mining area has not been constructed yet Drainage system can not be formed. According to past experience, a permanent water tank construction equipment at least 0.5 a. They use large diameter polypropylene pipe with the flange connection, the belt in the six mining area down the mountain and 4304 (North) fully mechanized mining belt head east side of the installation of assembled water tank.