论文部分内容阅读
本文就廊坊城区二维震源无桩施工数据采集中的物理点室内设计、COG数据处理等测量工作,提出并完善了一套工作流程,并对几个相关问题进行了简要分析。
In this paper, the measurement of physical point interior design, COG data processing and so on in two-dimensional seismic source-free pile construction in Langfang urban area is proposed, and a set of work flow is proposed and improved. Several related problems are briefly analyzed.