振动挤压混凝土压力管(以下简称一阶段管)自1968年在我国正式投产以来,以其管体结构整体性好,生产工序简单、效率高等优点,得到了生产厂及广大用户的欢迎。但是,在一阶段管的生产中,至今仍有许多问题没有得到根本的解决,如保护层空鼓、承口椭圆及环向预应力钢筋应力不明确等,使管子质量受到了很大的影响。为从根本上解决保护层空鼓等一系列问题,近年来,本人开展了一些研究工作,提
The vibrating and extruded concrete pressure pipe (hereinafter referred to as “one-stage pipe”) has been put into operation in China since 1968. It has been well received by production plants and users because of its good structural integrity, simple production process and high efficiency. However, in the production of first-stage pipes, many problems have not yet been fundamentally resolved. For example, hollowness of the protective layer, elliptical bearing and elliptical prestressed steel stress are not clear, and the quality of the pipe is greatly affected. . In order to fundamentally solve a series of problems such as hollowing of the protective layer, in recent years, I have carried out some research work.