【摘 要】
:
混流式水轮发电机组作为调相工况运行时,应使其转轮脱离尾水,否则就会产生较多的能量损耗。大型机组在水中调相运行耗功可达其额定容量的8~16%,而在气中调相运行时耗功可降低
论文部分内容阅读
混流式水轮发电机组作为调相工况运行时,应使其转轮脱离尾水,否则就会产生较多的能量损耗。大型机组在水中调相运行耗功可达其额定容量的8~16%,而在气中调相运行时耗功可降低为1.5%左右。因此凡是尾水水位不能自行消落到脱离转轮的水电站,都需要配备专门的空气压缩机以及数十立方米容积的大型贮气设备,用压缩空气强制地压低尾水管中
Francis turbine generator as phase modulation conditions should be run away from the tail water, otherwise it will have more energy loss. Large-scale unit in phase operation of water power consumption up to 8 ~ 16% of its rated capacity, while the phase modulation in gas consumption can be reduced to about 1.5%. Therefore, any tail water level can not be self-descended from the runner’s hydropower station, need to be equipped with a dedicated air compressor and the volume of dozens of cubic meters of large gas storage equipment, with compressed air to force down the tail pipe
其他文献
A novel mixed sol method was developed for the preparation of supported catalysts. Analyses by means of XRD and BET show that a 40%AgBiVMoO/γ-Al2O3 catalyst pr
我首先代表北京外国语大学国际汉语教学信息中心对各位嘉宾参加我们《国际汉语教学动态与研究》出版座谈会表示衷心的感谢!北京外国语大学国际交流学院是我国最早从事对外汉
从我县20多年来农村小水电事业的发展情况来看,绝大多数的农村小水电站系采用单机容量400千瓦以下的水轮发电机组。根据我国目前的水轮发电机型谱,单机容量大于400千瓦的机
由塔里木石油勘探开发指挥部和石油勘探开发科学研究院合作研究项目《塔里木盆地新区新带研究及目标选择》经专家评定一致认为 :“总体达到国际先进水平 ,具丰富典型的实际资
油田开发动态监测技术交流会于2000年6月25日到7月2日在春城昆明召开。本次会议参加单位有大庆、辽河、胜利等13个油田和西安石油勘探仪器总厂、Hblliburton国际能源公司等8个仪器制造厂家以及部分大
本文采用 Hypersil- ODS2 (4 .6mm× 2 5 0 mm,5μm)色谱柱 ,乙腈 -水 (70∶ 30 )流动相 ,2 4 2 nm测定波长 ,建立了测定 2 -苯基 4 -对甲苯基 - 1,5 -苯并硫氮杂 艹卓 -α-
用离子选择电极测定十种取代乙酸阴离子的相转移能力 ,得到其交换能力排序。
The ion-selective electrode was used to determine the phase-transfer ability of ten subs
摘 要:角色扮演教学法是以能力培养为目标,以互动与创新教学、全真模拟教学为特征的一种教学方法,该方法是餐饮服务教学中理论联系实际的桥梁,是教师引导学生参与教学活动,让学生扮演各种角色,进入角色情景,去处理多种问题和矛盾,达到加深对专业理论知识的理解的有效方法。本文就角色扮演基本步骤,运用此方法的教学过程及应注意的问题等内容进行了论述。 关键词:角色扮演法;餐饮服务;应用 中图分类号:G713
概述二江泄水闸位于二江中右部,共27个闸孔,三孔联成一个闸段,计9个闸段。溢流前沿长500.4米,加上左侧22米宽的厂闸导墙(墙内布置一个12×8米的排漂孔),右侧27.6米的纵向围
1975年冬,水电部第三工程局开展了水玻离灌浆材料的试验研究,找到了常用的配方。水玻离灌浆材料价格低廉,可灌性好,凝结时间可以任意控制,无毒性,对环境无污染,可用于止水,