【摘 要】
:
近日,广东省首个海上风电试点项目“珠海桂山海上风电场示范项目”获得广东省发改委核准,这标志着广东省海上风电开发正式启动。该项目本期建设规模为120WM,拟安装34台3WM风
论文部分内容阅读
近日,广东省首个海上风电试点项目“珠海桂山海上风电场示范项目”获得广东省发改委核准,这标志着广东省海上风电开发正式启动。该项目本期建设规模为120WM,拟安装34台3WM风电机组和3台6WM风电机组。项目建成后预计年发电量近2.66亿kWh,每年可节约标煤8.66万吨、减排二氧化碳20.67万吨,社会经济效益显著。
Recently, the pilot project of offshore wind power in Guangdong Province, “Zhuhai Guishan Offshore Wind Farm Demonstration Project”, was approved by Guangdong Development and Reform Commission, marking the official launch of offshore wind power development in Guangdong Province. The current construction scale of this project is 120WM. It plans to install 34 3WM wind turbines and 3 6WM wind turbines. After the completion of the project, it is estimated that the annual generating capacity will be nearly 266 million kWh, which will save 86,600 tons of standard coal and reduce carbon dioxide emissions by 206,700 tons per year, which will bring remarkable social and economic benefits.
其他文献
笔者长期从事鱼类养殖技术的研究,2011年在四川双流瑞枫红渔场池塘小网箱养殖罗非鱼过程中试验了不同微孔增氧方式的养殖效果,结果表明网箱外微孔增氧的生产效能比传统的网箱
在埃及和土耳其勃起功能障碍(ED)患者人群中,进行了一项随机化、双盲、平行分组、安慰剂对照研究,为期12周,对按需服用20 mg他达拉非的疗效和安全性进行评估。共有132例患者
吴勐先生是资深的非洲三湖慈鲷玩家,也是云湖慈鲷门店的店主,还是长期在我们《水族世界》发表文章的资深作者,是《水族世界》的老朋友了。几乎所有《水族世界》的作者都是水
Marine sponge Tedania anhelans distributes throughout the intertidal zone of Fujian, southeastern China, and is a potential source of natural bioactive products
针对现有城轨列车启动速度异常通过人工判断的方式存在不确定等问题,提出一种基于启动加速度及其标准差数量偏差阈值比对分析的列车启动速度异常的检测方法,研究了该方法的可
《暴风雨》写的是一个男人对他和一个女人片刻激情(隐私)的回忆和再解读,书写的是人类情感的复杂性,以及它和理智,共同带来的美好回忆。从小说中不难看出,激情和理智的双重体
川江将继续以扎实的行动和开放的态度服务行业和客户,锐意进取,力争为更多的客户提供优质的产品和服务。2010年,国家电网公司制定了《关于加快推进坚强智能电网建设的意见》,
The marine green alga Chaetomorpha valida fouls aquaculture ponds along the coastal cities of Dalian and Rongcheng, China. Unialgal cultures were observed under
随着国家电网公司推进构建全球能源互联网,加快中国能源互联网建设决策的全面深化,公司对专业化公司提出了新的期待和更高的要求。为了落实公司党组“集约化、专业化、属地化
目的观察泌尿系统感染病原菌分布及耐药性分析的疗效。方法门诊及住院疑似泌尿系统感染的患者采取自主排尿法采集中段尿,分离出的细菌进行计数,革兰氏染色,自动鉴定仪及配套