论文部分内容阅读
在项目清表完成后,设计院与业主、专家、监理及施工单位联合对结构物、沿线道路及水系情况进行了现场排查,通过排查和对比,优化施工图设计方案,减少了占地,降低了路基填土高度,节约建设成本,证实了优化路基、路面及防排水设计方案的必要性。在满足高速公路建设标准的前提下,以建设节约型高速公路、最大限度的满足沿线群众的生产及生活的需要为目标,构建高速公路建设与沿线群众良好生活环境的和谐社会。
After the completion of the project clearance, the Design Institute and the owners, experts, supervisors and construction units jointly conducted on-site inspection of the structures, roads and waterways along the route. Through the investigation and comparison, the design plans of construction drawings were optimized, which reduced the land occupation and reduced Subgrade filling height, saving construction costs, confirmed the need to optimize subgrade, pavement and drainage design. Under the premise of meeting the standards of expressway construction, the goal is to build a conservation-free expressway and meet the production and living needs of the masses to the maximum extent possible. Therefore, a harmonious society of highway construction and the good living environment along the masses should be established.