2012年4月,无锡检验检疫局检查人员在对辖区内某电子企业(以下简称S公司)认证行政执法时发现,广州某认证机构(以下简称C机构)在2011年11月对S公司“液晶显示模块及零部件的设计和制造”进行了扩大审核。在审核发生时,该项目并未进行环境影响评价,也未取得环保部门同意建设的批复和试生产(运行)的环保核准通知。但是C机构仍然通过了审核,并发放了相应的证书。检查人员对此案进行了仔细的调查分析,最终对C机
In April 2012, inspectors of Inspection and Quarantine Bureau of Wuxi found that when a certification body (hereinafter referred to as “Institution C”) of Guangzhou issued a certification to an electronic enterprise (hereinafter referred to as “S Company”) in its jurisdiction, Design and Fabrication of LCD Modules and Components ". At the time of the audit, the project did not conduct environmental impact assessment and did not obtain the approval of environmental protection departments approved the construction and trial production (operation) of the environmental approval notice. However, the agency C still passed the audit and issued the corresponding certificate. Inspectors conducted a careful investigation of the case, the final C machine