论文部分内容阅读
穆龙陶露天金矿运输坚硬剥离岩石的(500mm块级出率平均为1.8%~2%)间断-连续工艺装置,是根据乌克兰科学院地球工程物理研究所的科研成果,由乌克兰煤炭、采矿和瓦斯工业科学研究设计院设计的。它的间断工艺环节使用ЭКГ-8И型和ЭКГ-12.5型电铲和БелАЗ-549和БелАЗ-7519自卸汽车,而连续工艺环节,由4台带宽2m的胶带机组成的两条胶带运输线和两台排岩机组成
Mu Longtao open-air gold transport hard peeled rock (500mm block average rate of 1.8% ~ 2%) intermittent - continuous process plant, is based on the Ukrainian Academy of Sciences Institute of Geotechnical Physics scientific research by the Ukrainian coal, mining and Gas Industrial Scientific Design Institute. Its discontinuous process uses the ЭКГ-8И and ЭКГ-12.5 electric shovels and the БелАЗ-549 and БелАЗ-7519 dump trucks, while the continuous process consists of four tape transport lines consisting of four 2m tape feeders and Two row of rock machine components