洞庭湖堤垸修复工程,自一九五四年十二月一日全面开工以来,经过四个半月的努力,现在已全部胜利完工。洞庭湖堤垸修复任务是浩大和艰巨的,全部工程包括西洞庭湖、大通湖、南洞庭湖区的重点垦区、蓄洪垦殖区和二百六十个一般堤垸的修复及建闸、开堤等工程。遵照中央和中共湖南省委会、前湖南省人民政府关于迅即帮助灾区人民恢复生产、重建家园的指示与「重点整修、医治创伤、清除隐患、险堤加固,有计划的并流堵口,合修大圈,争取农业丰收」的方针,自一九五四年九月中旬开始,即积极地进行了查勘、规划测量、定线等施工准备工作,并
Dongting Lake embankment repair project, since December 1, 1954 started in full swing, after four and a half months of hard work, has now been fully completed. Dongting Lake embankment embankment repair task is vast and arduous, all of the project, including West Dongting Lake, Chase Lake, South Dongting Lake focus reclamation area, flood storage and reclamation area and two hundred and sixty general embankment repair and construction of gates, open embankment engineering. Follow the directives of the CPC Central Committee and the Hunan Provincial CPC Committee and the former Hunan Provincial People’s Government about immediately helping the people in disaster areas to resume production and rebuild their homeland. They will also “focus on renovation, cure trauma, remove hidden dangers, reinforce dangerous levees, ”We should actively carry out construction preparations such as surveying, planning and surveying, alignment and so on from the mid-September 1954 onwards.