论文部分内容阅读
1工程简介某20000t立筒库工程由立筒仓和工作塔两部分构成(参见图1)。立筒库由18个高37.5m的圆筒仓构成;它们相互联结成整体结构。筒库距长江边仅见外地下水受江水制约。1993年进行了工程地质勘察,立筒库地基由下列上层构成:①为素填土;填上时间一般在5年以内,厚?..
1 Introduction to the Project A 20,000 t vertical silo project consists of a vertical silo and a working tower (see Figure 1). The vertical silo consists of 18 cylindrical silos that are 37.5m high; they are connected to one another as a unitary structure. From the Yangtze River, only the outer groundwater is restricted by the river water. In 1993, an engineering geology survey was carried out. The foundation of the vertical silo library was composed of the following upper layers: 1 is plain fill; the filling time is generally within 5 years.