论文部分内容阅读
潞安集团常村煤矿位于山西省屯留县东部,是我国首次利用世行贷款建设的特大型现代化煤矿,1985年开工建设,1995年建成投产,设计能力年产400万吨,核定生产能力600万吨。矿井采掘、运输、提升、通风等主要设备均为国际招标、全球采购,代表了上世纪八十年代世界煤炭开采的先进装备水平。作为潞安集团的主力矿、骨
Lu’an Group Changcun Coal Mine is located in the eastern part of Tunliu County, Shanxi Province. It is the first large-scale modernized coal mine with the World Bank loan in China. It was started construction in 1985 and completed and put into production in 1995 with an annual capacity of 4 million tons of design capacity and a verified production capacity of 600 Tons of tons. Mine mining, transportation, upgrading, ventilation and other major equipment are international bidding, global procurement, on behalf of the eighties of last century the world advanced level of coal mining equipment. Lu’an Group as the main mine, bone