为了在较短时期内提高发电设备的安全性、可靠性、经济性、可调性,并满足环保要求,提高生产能力,在国家电网公司“SG186工程”的指引下,国网能源开发有限公司(以下简称公司)走自主创新道路,于2008年4月研究与开发综合生产管理系统,其中电厂技改项目集中管控平台作为典型示范模块,目前已经成功上线运行。
In order to improve the safety, reliability, economy and adjustability of power generation equipment in a relatively short period of time and meet the environmental protection requirements and increase the production capacity, under the guidance of SGCC “SG186 Project”, State Grid Energy Development Co., Ltd. (hereinafter referred to as the Company) took the road of independent innovation. In April 2008, it researched and developed an integrated production management system. The centralized management and control platform for power plant technological transformation projects, as a typical demonstration module, has been successfully launched.