论文部分内容阅读
模板在水利水电工程混凝土施工中占有十分重要的地位,为适应水电工程建设管理的需要,在新编的水电工程概、预算定额中,将模板从混凝土定额中分离出来。模板定额共分25节,每节为一种类型模板,每种模板分为“制作”定额和“安装、拆除”定额两项。定额消耗量的拟定,以目前国内较先进的模板结构和水电行业平均偏先进的施工水平为控制原则。
Template in the water conservancy and hydropower project occupies a very important position in the concrete construction, in order to meet the hydropower project construction management needs, in the new hydropower project outline, budget quota, the template from the concrete quota separation. Template quota is divided into 25 sections, each section is a type of template, each template is divided into “production ” quota and “install, remove ” fixed two. The formulation of fixed consumption, with the current domestic advanced template structure and hydropower industry average advanced construction level as the control principle.