论文部分内容阅读
2001年至2002年7月,白石窑水电厂结合机组基础自动化元件的改造,对上位机系统落后及机组LCU功能不完善等问题进行了完善和改造,有效地解决了电厂投产以来计算机监控系统不能正常运行的问题,大大提高了电厂的运行管理水平,增强了电厂的竞争力。本文介绍了改造后电厂计算机监控系统的功能、硬件配置、应用软件及系统性能指标等技术参数。
From 2001 to July 2002, Baishiyao Hydropower Plant combined with the transformation of the basic automation components of the unit, improved and renovated the problems such as the overriding of the upper computer system and the imperfect LCU function, which effectively solved the problems that the computer monitoring system could not The normal operation of the issue, greatly improving the operation and management of power plants, and enhance the competitiveness of power plants. This paper introduces the technical parameters of the computer monitoring and control system functions, hardware configuration, application software and system performance indicators after transformation.