论文部分内容阅读
在最近刚刚结束的四川省委六届九次全委会议上讨论通过的《四川省国民经济跨世纪发展战略》中。水电开发已作为四大基础建设的重点之一,摆在十分突出的位置。省委书记谢世杰,省长宋宝瑞要求全省上下大开绿灯,切实抓紧抓好。迄1996年底,四川省装机容量已达到1323万kW,发电量达到618亿kW·h,但人均装机容量和人均电量均大大低于全国平均水平,电力供需矛盾仍较突出,缺电已成为制约经济发展的瓶颈因素之一。重庆直辖后,四川省委、省政府针对行政区划
In the recently concluded “Sichuan Province National Economy Cross-century Development Strategy,” which was discussed and approved at the Ninth Plenary Session of the 6th CPC National Committee of Sichuan Province. Hydropower development has been one of the four major infrastructure priorities, placed in a very prominent position. Xie Shijie, secretary of the provincial party committee, Governor Song Baorui asked the province to go ahead and open up the green light. As of the end of 1996, the installed capacity of Sichuan Province had reached 13.23 million kW and the generating capacity reached 61.8 billion kW · h, but the per capita installed capacity and per capita electricity consumption were much lower than the national average. The contradiction between supply and demand remained outstanding. Power shortage had become a constraint One of the bottlenecks in economic development. After the municipality directly under the Central Government, Sichuan Provincial Party Committee and Provincial Government targeted the administrative divisions