人工挖孔灌注桩施工机具简单,桩孔可以挖到设计要求的持力层取样试验,且孔底扩大后可以增加桩的支承面,孔底残渣、杂物较易清除;使挖孔桩成为端承构件,不仅沉降量小,单极载承力大,使高层、超高层建筑有了可靠的基础支承,且造价较低。目前,我省相当多的高层建筑基础都选用人工挖孔桩,地下室基坑开挖不少亦以人工挖孔桩作为支护结构。
The construction equipment for manual digging and pouring piles is simple, and the pile holes can be excavated to the bearing layer sampling test required by the design, and the bearing surface of the pile can be increased after the hole bottom is enlarged, and the bottom residue and debris can be easily removed; The end bearing members not only have a small settlement, but also have a large uni-polar bearing capacity, so that the high-rise and super-high-rise buildings have a reliable foundation support and the cost is low. At present, a large number of high-rise building foundations in our province use manual digging piles. Many excavation basement pits also use manual digging piles as supporting structures.