一、绪言东予冶炼厂于1971年建成。铜电解车间具有4500吨/月的电解生产能力,作为新建车间于1973年开始生产。投产以来,稳定提供优质电解铜,进行无公害高产率的生产。 1982年建成制氧设施,使闪速炉精矿冶炼能力由1050吨/日提高至1350吨/日,与此同时,电解车间的生产能力1983年度也增加到6300吨/月。脱铜电解操作,在原工业电解生产基础
First, the introduction East to the smelter built in 1971. The copper electrolysis plant has a production capacity of 4,500 tons / month of electrolysis and started production in 1973 as a newly built workshop. Since put into production, stable supply of high-quality electrolytic copper, high-yield pollution-free production. In 1982, an oxygen plant was built to raise the smelting capacity of the flash furnace concentrate from 1050 tons / day to 1350 tons / day. Meanwhile, the production capacity of the electrolysis workshop was also increased to 6300 tons / month in 1983. Removal of copper electrolysis operation, based on the original industrial electrolytic production